For many companies, a custom information system (IS) is an essential tool for managing processes, data and resources effectively. Whether it is a CRM, an ERP, an order management system or an HR platform, the question "How much does a custom information system cost?" always comes first. The answer is not universal, but there is one key message: you yourself have the biggest influence on the price of a custom information system. As someone who knows your business in depth, you are in the position of the project's chief architect.

Why are you the chief architect of your IS project?

Your detailed knowledge of the company's processes, your employees' specific needs and the company's strategic goals gives you unique control over how complex and costly your information system will be. Let's look at how you can work with these factors:

1. Scope and complexity of features: your main tool for optimizing costs

This is by far the biggest price factor and also the area where you have the most room for savings. The more modules and complex features you want, the higher the price.

Simplifying assumptions – save up to 90%: Instead of trying to squeeze every possible feature into the first version of the IS, focus on a Minimum Viable Product (MVP), or "phase 1". Ask yourself: "Which processes are critical and must be digitized right away? What will save us the most time and money in the first phase?" Often only the basic modules that digitize key operations are enough. For example, instead of a fully automated HR system with many integrations, start with a module for attendance and leave management. With this phased, pragmatic approach, you can cut the initial project costs by 90%! Many successful systems started small and grew gradually.

2. Degree of integration and quality: the price can move by an order of magnitude

As the architect, you can define what level of integration and precision your information system really needs in the first phase. Do you need fully automated integration with ten external systems and a top-notch user experience in all modules right away? Or is a manual data export/import enough for some less critical processes to start with?

Functional reliability vs corporate "perfection": You can choose a system that is primarily functional and reliable, even if some visual elements are not absolutely perfect or processes are not fully automated from day one. Postponing some complex integrations or user interface refinements to later phases, if they are not critical for immediate benefit, can cut the price of the project by another order of magnitude.

3. Use shared components. Savings of an order of magnitude

Suggest using shared components. Using existing pieces of code simplifies the work fundamentally. Do we really have to have everything our own way?

4. Developers' hourly rate: an effect of "only" ±30%

The developers' hourly rate, whether internal or external, is of course part of the budget. Different teams and locations have different rates. Nevertheless, this factor affects the total price by only plus or minus 30%.

Value for money: A cheap hourly rate doesn't necessarily mean a cheaper final price if it leads to longer development, more bugs or higher demands on your time managing the project. Always weigh value for money and the team's experience against the price.

5. Use a building kit – and another order of magnitude down

Use a framework (a software building kit) designed for building information systems. I have one such framework for building information systems here, but there are several others.

How can you yourself change the price by two orders of magnitude?

The key to optimizing the cost of a custom information system lies in your hands. If you are an active "architect" of the project and focus on:

  1. Simplifying the first version as much as possible and phasing the project (the MVP approach, simplifying assumptions) – savings of up to 90%.
  2. Defining the necessary quality and degree of integration in the first phase (a functional, but not necessarily absolutely perfect solution) – savings of another order of magnitude.
  3. Using a building kit designed for information systems, an efficient way to solve the problem – savings of another order of magnitude.

By combining these approaches, you can easily cut the total price of a custom information system by two orders of magnitude! A system that would cost millions in a full, highly integrated and perfectly tuned version can be built for a fraction of that as a basic, functional MVP.

Other factors affecting the price of an IS:

  • Analysis and consulting: A thorough pre-project analysis is essential, but its scope affects the price.
  • Technology platform: The choice of specific technologies (databases, programming languages, cloud) affects complexity and price.
  • User training: The cost of training employees.
  • Data migration: Moving existing data into the new system.
  • Maintenance and support: Long-term costs of operation, updates and bug fixes.
  • Security audit: Ensuring the system is robustly secured.

Indicative prices

When you go to a car dealership to buy a new car, you already have some expectations about its price. There are plenty of influencers who review cars and mention their prices too. With custom information systems, there is nothing like the usual publication of prices in public. Companies therefore can't have even a rough idea of what software costs and how high the price of a piece of software can climb. That's exactly why I took the trouble to put together the table below.

Scope and type of ISDescriptionWhat the price includesPrice range in thousands of EUR
Small CRMYou only care about the basics: you want to know what you replied to whom about an enquiry, how all communication with customers is going, and keep track of the number and progress of orders.5-10 tables including editing (CRUD), user login.14-32
Larger CRMWhen you need a complete overview plus links to other information systems, possibly to an ERP.11 or more tables including editing (CRUD), exports and imports to other systems, user roles.32-100+
Small ERPFor example, you need to process data from a few machines in your production process.5-10 tables including editing (CRUD), user login.20-48
Larger ERPYou have a more complex production process. You depend heavily on suppliers and also need links to warehouses, suppliers and logistics.11 or more tables including editing (CRUD), exports and imports to other systems, user roles.48-200+
Small HRYou need to record basic information about employees, payroll data, health and safety, training, …5-10 tables including editing (CRUD), user login.12-28
Larger HRIt makes sense for you to simplify the whole HR agenda. You have links to health and safety systems (SAWAPP), job portals, …11 or more tables including editing (CRUD), exports and imports to other systems, user roles.28-80+
Small warehouseYou need to record information about goods that can't be entered into standard solutions. For example, several batches for each product, storage temperature logging, …5-10 tables including editing (CRUD), user login.16-36
Larger warehouseYou have hundreds of thousands of stock items or more and also need to handle logistics.11 or more tables including editing (CRUD), exports and imports to other systems, user roles.36-160+

This is far from an exhaustive list. You will find more examples on the page about the price of mobile applications or the page about the price of web applications.

Important notes on prices

It is important to stress that the price of an information system depends extremely on the depth of the analysis, the complexity of the processes it digitizes, and the need to integrate with other systems (accounting, banks, government, etc.).

Get an exact quote:

A thorough specification is essential for a specific quote. It should contain:

  1. The business goals and the problems the IS should solve.
  2. Existing processes and data.
  3. A detailed list of required modules and features with priorities.
  4. The required degree of integration with other systems.
  5. Number and type of users.
  6. Time frame.
  7. An indicative budget (if you know it):

Let me pause at the last point. Given the ways you yourself can influence the price described above, it is very practical to state an indicative budget. This gives developers a clear boundary and allows them to design a custom system that fits your budget. A good supplier will propose the most efficient solution with prioritized features to match your financial possibilities, instead of trying to sell you as much as possible.

So how much does an information system for our company cost?

If you now have a clear picture, try my online information system price calculator.

Conclusion

Investing in a custom information system is a strategic step. With an active approach to defining the scope and quality of the project, you can get an efficient solution for your business at an optimal price. The key to how much your information system will cost is in your hands alone!